|
Binalood wind farm opening by President Mr Ahmadinejad,
power minister (Mr Fattah), Industry & Mine Minister (Mr Mehrabian),
Executive Vice President, Khorasan Governor-General, Mr Vahdati, Mr Armudli and
related officiaries and specialists was great honor for Iranians, Sadid
Industrial Group and Saba Niroo. Beside this a new project starting including 50
units S47-660 wind turbine installation in Binalood region, has made hopefully
to growth in wind power using in Iran and it is hope to manufacture and install
these type of wind turbine in different regions in our country…Binalood located
in 60th km of Mashhad, is the second wind farm in Iran after Manjil
site that was started to implement in year 1383. Binalood project was included
executing civil work, manufacturing, installation and commissioning of 43 units
S47-660 kW wind turbine in total capacity of 28.2 MW in Binalood site.
|